Michaël HIDRIO
33 (0)2 32 74 00 20 |
|
|
 |
|
 |
 |
|
 |
| |
As
a unique development center point in France,
the Le Havre region has, for several years,
initiated and supported large programs of
investments converging on its famous sectors
of activity… (Link : Project
realized, Programs
in progress, Port
2000)
Additional
proof, if it were needed, is the confidence
of the major contractors in the dynamism
and future prospects of the maritime metropolis! |
| |
|
|
 |
| |
|
Roll-on/roll-off
services |
| Project:
|
1st
phase: development of the roll-on/roll-off
terminal with the realization of a
380-meter quay extension (investment:
€ 17 M)
2nd
phase: achievement of an additional
10 hectares of platforms, development
of a single entry and installation
of a control system to meet the ISPS
standards, realization of a second
railway program |
| Objective:
|
To
face the strong increase in new vehicle
traffic (about 500,000 units/year) by
developing the capacity to welcome and
handle the ultra-modern roll-on/roll-off
ships (6,000 vehicles) |
| Commissioning: |
2003
(phase 1)
2005 (phase 2) |
| |
|
|
River
terminal |
| Project:
|
Construction
of a river terminal directly connected
to Port 2000 |
| Objective:
|
To
face the increase in river traffic between
Le Havre and Paris. To ensure a quick
connection with goods handled via Port
2000. |
| Commissioning: |
At
the same time as Port 2000 |
| Investment:
|
Incorporated
in Port 2000 |
|
| |
 |
| |
|
Prologis |
| Project:
|
Construction
of 126,000 m² of warehouses for
rental within the Hode Logistics Park. |
| Objective:
|
To
develop the supply of logistics warehouses
for rental to face the strong demand
of logistics specialists from the perspective
of Port 2000 commissioning. |
| Commissioning: |
2002-2005
(last phase of 30,000 m² in progress) |
| Investment:
|
€
50 M |
| |
|
|
Katoen-Natie |
| Project:
|
Construction
of 18,000 m² of warehouses at Radicatel |
| Objective:
|
To
ensure logistical services on behalf
of a new customer. |
| Commissioning: |
From
2005 |
| Investment:
|
Not
known |
| |
|
|
IXIS
- AEW / ADIM |
| Project:
|
Construction
of 135,000 m² of warehouses for
rental over 30 ha within the Normandy
Bridge Logistics Park (PLPN). |
| Objective:
|
To
develop the supply of logistics warehouses
for rental to face the strong demand
of logistics specialists from the perspective
of Port 2000 commissioning. |
| Commissioning: |
From
2006 |
| Investment:
|
€
50 M |
|
| |
 |
| |
|
Total |
| Project:
|
Construction
of a Distillate HydroCracker (DHC) and
of the top European hydrogen production
unit (Steam Methane Reformer - SMR) |
| Objective:
|
Increase
in production capacities (8% additional
diesel / 2.4 million tons/year), production
of cleaner fuels meeting the requirements
of the new European standards and growth
in the production of hydrogen |
| Commissioning: |
2006 |
| Investment:
|
€
530 M |
| |
|
|
Total
Petrochemicals (AtoFina) |
| Project:
|
Renewal
and modernization of production tools.
Ensuring security of installations.
Environmental improvements. |
| Objective:
|
Increase
in production capacities. Conformity
with new environmental standards. |
| Commissioning: |
2005 |
| Investment:
|
€
100
M |
| |
|
|
PPG
Coatings |
| Project:
|
New
production lines - Environmental protection
- New office buildings |
| Objective:
|
Development
of PPG Coatings activity on a single
site |
| Commissioning: |
2005-2007 |
| Investment:
|
€
7.5 M |
|
| |
 |
| |
|
Renault |
| Project:
|
Modifications
in painting process and production control |
| Investment:
|
€
70
M |
|
| |
 |
| |
|
EDF |
| Project:
|
Optimization
of production of Le Havre thermal power
station, number one French site for
the production of electricity from coal |
| Objective:
|
Optimization
of production capacities. Conformity
with future environmental standards. |
| Commissioning: |
2005-2006 |
| Investment:
|
€
100
M |
|
| |
 |
| |
| |
| |
|
|
|
|